It's been almost the end of April, but our progress on the Pipe Rack Line 5 at South Pacific Viscose still far far away from the target. The target should be 60% in the end of this month, but we only reach 48.98% for over all job on the Pipe Rack. I know there is so many problem on the field when we doing Piping and Fabrication for this job. For example, there is too many Pipe Rack doesn't suit to with the drawing, or too small support, so it's not possible if we put 24" Inch Pipe on that Pipe Rack and also the other problem such as unfinished pipe rack and support. Because all the Pipe Rack and support is doing by Civil.
We can't joint straight because the limitation of pipe rack
We who doing the Piping Job, it's really face the hard situation here, because only one week left but we have to chase 10% delay from the target. We hope everything will be fine as our planning. By the way, today Piping and Fabrication only post about this, because this is very important to me to catch everything on time.
Thanks for visiting and Good Luck.
No comments:
Post a Comment