Friday, June 15, 2012

ERECTION PIPE AT WATER TREATMENT PLANT

This is really exhaust day to all of us at site project, including myself. with Piping and Fabrication, I will share the experience when me and my team has to finish Shutdown with only four hours limitation, because the machine will running again. 

With all the preparation that we already prepare about few days ago, everything almost run according to the schedule, except in few line that I have to cut and re-weld pipe line DN300 because it's not has good gap to weld. And when we have to finish all the line with 4 hours left, so we do anything necessary to finish the job so the plant can running again.

I know this experience with Erection Pipe at Water Treatment Plant during Shutdown will never forget, because we have small bonus from the users and that's make me and my team work as harder we can do. and here it is few pictures when we do the erection pipe DN300 and install valve at Water Treatment Plant.

Erection Pipe

Cut and Re-Weld Pipe

The Pipe has been joined

That's all what Piping and Fabrication can told about Erection Pipe at Water Treatment Plant during 4 Hours Shutdown.