Continuing again with WTP Project, and now at Demin Plant, we doing Piping Erection for Filter Water Line. It’s really hard place to do the piping erection, because we do this erection inside Demin Plant building and we only have small space and we can’t make any mistake. Because if something goes wrong, the existing pipe and tank will crush by that pipe.

 Manually Piping Erection at Demin Plant

With a very little space between the wall and existing pipe and tank, 
we have to do piping erection manually

So we really have to extra carefully in this process, and Piping and Fabrication believe that our man can do this one, because they have experience for this kind of situation. 

The planning is, after we complete all this Filter Water Line, and all the support and civil work is complete also, we will make this team to do the erection in the same location with another line, which is Soft Water Line, but we still waiting for that time, and I hope that will happen soon.

No comments:

Post a Comment