Piping Erection for Filter Water Line


Continuing again with WTP Project, and now at Demin Plant, we doing Piping Erection for Filter Water Line. It’s really hard place to do the piping erection, because we do this erection inside Demin Plant building and we only have small space and we can’t make any mistake. Because if something goes wrong, the existing pipe and tank will crush by that pipe.

 Manually Piping Erection at Demin Plant

With a very little space between the wall and existing pipe and tank, 
we have to do piping erection manually

So we really have to extra carefully in this process, and Piping and Fabrication believe that our man can do this one, because they have experience for this kind of situation. 

The planning is, after we complete all this Filter Water Line, and all the support and civil work is complete also, we will make this team to do the erection in the same location with another line, which is Soft Water Line, but we still waiting for that time, and I hope that will happen soon.

Wednesday, August 15, 2012

Water Treatment Project Still on The Way

After almost a few months Piping & Fabrication not posting, because of the Water Treatment Project (WTP) is still on the progress, so I can't do much on the office, cause I have to supervise and control the project and make sure that project is running well.

After almost more than a month, our WTP project is already reach 46% from total 12000 inch dia, and it still doesn't make me happy because we don't have enough worker to do that project (less workers). But, on the other side Piping and Fabrication feel so happy that we can prove to everyone, even we only have no more than 20 persons, but we still can reach more than 45% until now.

So much people doesn't believe that me and my team can do the WTP project in time, but we already prove it to anyone that we can do it and silent them with that progress.