In the end of Water Treatment Project for all the lines such as Filter Water, Soft Water, Raw Water, Sand Filter, Dynasand and etc, including all the Equipment or Tank, Multigrade Tank, Softener Tank and Demin Water Tank, there is so many thing we can learn from that project.
It's really hard to control people or can we call Man Power, because we have a big hope to them, when we hire them, they will do as professional worker, but the fact is we have to make them work, teach them how to work, and told them how to work and that's really such a big problem for me and my team. But, we have to take that responsibility, because we can't hire another worker, they all the same, mostly they can't work especially helper.
Luckily that we had very competent and good leader, so they can arrange all that worker, even we know that's really hard but we have to use them. Not mention the users want to do this, want to do that, like they never know the problem on the field, everything can goes wrong if we push them too much.
Piping and Fabrication only hope everyone will understand that we already work as maximum as we can, as hard as we can and we can do nothing more than it, this is the best what we can do for now. We hope, we really hope.
Thanks for everyone who supporting us to finish this WTP Project, especially my teams, once again thank you very much.
No comments:
Post a Comment