Here it is the pictures of Hydro Test, we start from 16.45 to fill the water in, and at 17.50 the pressure start stabilize and we start holding time about 1 hour and finish about 19.00 WIB. This is Piping and Fabrication Reporting.
Pressure at 11 Bar for Filter Water Hydro Test
Starting Holding Time at 17.50
Filter Water is Completed
Once more we are thanks to someone always helping us which is Mr. Pandi, because he always lead us and warn us if there is some problem with our job, and of course to my teams, Congratulations Teams!
No comments:
Post a Comment